Verification Gate

Verification Gate

An approval gate stops the pipeline and waits for approval either from a human user or from a computer based on data from a supported plugin.

You can add a Verification Gate after creating a pipeline to the application. To add a Verification Gate follow the steps below:

If you haven’t created an application already, click herearrow-up-right.

If you haven’t created your pipelines yet, click herearrow-up-right.

  1. From the Application dashboardarrow-up-right, select your application name which you need to edit a pipeline. Click Three dots at end of the application name and then select "Edit Pipelinearrow-up-right" as shown in the image below.

2. The Pipelines page appears, where you need to add the Approval Stage. Click Add Stagearrow-up-right, select Verification from the Type drop-down as shown in the image below.

3. The Verification Configuration page appears. You need to configure the verification gate with the attributes as shown in the image below:

  • Verification configuration attributes

    • Environment: Select your environment from the drop-down menu

    • Log Template: Select or Create Log Template

    • Metric Template: Select or Create Metric Template

    • LifeTime: Minutes to let the analysis run before making a final determination

    • Marginal Score: If the score is equal to or higher than the Marginal but lower than the Pass Score, Review status is shown in the Analysis screen

    • Pass Score: If the Score equal to or higher than Pass Score, the stage will Pass

    • Baseline Real Time: Start time of stage execution will be taken as Baseline Start time

    • Baseline Start Time: Baseline Start Time for the analysis

    • Canary Real Time: Start time of stage execution will be taken as Canary Start time

    • Canary Start Time: Canary Start Time for the analysis

6. Click Save changes and the Verification Gate is added to your pipeline.